Grants are proposed to cover up to 50% of the cost of the storage component, whose capacity in MW must be equal to between 30% and 50% of the wind or solar project. The proposed quota for the first tender is 570 MW of wind and solar, with 150MW/300MWh of storage capacity.
Read More Download files