The National Capital Region Transport Corporation (NCRTC) has invited bids to set up 3 MW rooftop solar projects in the Delhi–Ghaziabad–Meerut Namo Bharat Corridor.
				    SJVN Ltd. has floated a tender to select solar rooftop power developers for a cumulative capacity of 5830 kW of grid-connected rooftop solar power projects (without battery
				    Request for selection (RfS) of Solar Rooftop Power Developers for setting up of cumulative capacity of 1400 KW Grid connected Rooftop Solar PV Power Projects (Without battery
				    Estonia has taken a monumental step towards a sustainable future with the approval of a major solar-plus-storage project on a former oil shale quarry in the northwestern
				    The Assam Power Distribution Company (APDCL) has invited bids to set up rooftop solar projects with a cumulative capacity of 134 MW across government buildings under the PM Surya Ghar: Muft Bijli Yojna. The capacity
				    Prices for solar cells have fallen steadily in recent years (Figure 5), moving against generally rising energy prices, and the outcome of this divergence has been to make it increasingly cost
				    Lakshadweep Electricity Department has invited bids to install 2,107 kW of rooftop solar systems with a 3 kWh battery energy storage system for each kW on government buildings. Bids must be submitted by April 10, 2025.
				    Now, the project moves forward, as authorities have approved construction of what will be one of the Baltic region''s most significant grid-scale battery installations. It could help stabilise Estonia''s electricity supply during peak
				    Tallinn, Estonia – January 2024* – SUNROVER has marked its Nordic market expansion with the successful deployment of a flagship 30kW/80kWh commercial Energy
				    SJVN Ltd. (SJVNL) has launched a Request for Selection (RFS) for Solar Rooftop Power Developers (SRPDs) to install a total capacity of 18 MW of grid-connected rooftop solar power projects (without battery storage)
				    It is worth noting that the French Ministry of Industry and Energy has previously announced a reduction in incentives for rooftop solar projects below 500kW starting from
				    SECI invites bids for 1750 kW rooftop solar projects covering five projects under the RESCO model; bid deadlines set for February and March 2025.
				    ₹37 million (~$428,878)- Category 7 ₹23.3 million (~$270,077)-Category 8 Successful bidders must have positive net worth in the last two financial years. In January
				    Estonia utility Eesti Energi has completed the procurement for its 26.5MW/51MWh BESS with LG Energy Solution to provide the batteries.
				    Assam Power Distribution Company Limited (APDCL) has issued a tender to develop 134 MW of rooftop solar capacity across government buildings under the PM Surya
				    The LCOE across all regions ranged from €0.05/kWh to €0.12/kWh at a 6% discount rate. The researchers say these results show rooftop systems are economically viable in each of the countries.
				    In another significant development, in July 2022, the central government launched a single national digital portal to simplify the process of rooftop solar installation for residential consumers. The centre has also formalised a direct benefit
				    The SEIN project led by the Houston Advanced Research Center developed the Solar for Safety and Success: Resource Guide to give residents in Port Arthur greater access to the potential resilience
				    The project aims to set up a cumulative capacity of 5140 kilowatts (kW) of grid-connected rooftop solar PV power systems without battery storage. These systems will be
				    The deadline for bid submission is March 28, 2025, up to 6 p.m. The technical bids will be opened on March 29, 2025, at 11:30 a.m., while the financial bid opening date for
				    NHPC has invited bids for setting up a cumulative 24.22 MW rooftop solar projects on 245 government buildings in 25 states/union territories under the renewable energy
				    Request for selection (RfS) of Solar Rooftop Power Developers for setting up of cumulative capacity of 18.00 MW Grid connected Rooftop Solar PV Power Projects (Without battery
				    SJVN has issued a request for selection for setting up cumulative 18 MW grid-connected rooftop solar projects in Delhi, Punjab, Rajasthan, Haryana, Uttar Pradesh, Bihar, Jharkhand, Madhya Pradesh,
				    These prices were lower, relatively, than the prices arranged for other solar auctions in Germany, with the volume-weighted average price of the successful rooftop bids reaching €0.089 (US$0.097
				    UPNEDA Invites Bids for 500 MW Rooftop Solar PV Projects in Uttar Pradesh Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has issued a
				    The company will use funding to build and operate a solar park in the country, accelerating the Baltic region''s green transition and electricity independence.
				    Singareni Collieries Invites Bids for 5 MW Rooftop Solar Plants in Telangana The Singareni Collieries Company (SCCL) has invited bids to set up 5,000 kWp of grid
				    In another significant development, in July 2022, the central government launched a single national digital portal to simplify the process of rooftop solar installation for residential
				    Assam Power Distribution Company Ltd. has issued an RfP for the selection of solar rooftop power developers for a cumulative capacity of 134 MW of grid-connected rooftop
				    Researchers from Riga Technical University and Czech Technical University in Prague have explored the economic feasibility of rooftop solar systems in multi-apartment
				    SJVN has issued a request for selection for setting up cumulative 18 MW grid-connected rooftop solar projects in Delhi, Punjab, Rajasthan, Haryana, Uttar Pradesh, Bihar,
				    Additionally, all the associated works related to project commissioning and O&M must be carried out by the developer. The completion timeline for the projects is 12 months
				    The Major Solar Projects List is a database of all ground-mounted solar projects, 1 MW and above, that are either operating, under construction or under development. The list is for informational purposes only, reflecting
Considering the above, the Baltic States have significant technical potential for rooftop PV installations to support the energy transition. EU policymakers have highlighted renewable energy communities as a key driver of this transition, as they promote citizen participation and local control over renewable energy decisions .
Between 2022 and 2024, the expansion of solar energy production across the Baltic region has exceeded even the most optimistic forecasts. By June of 2024, Estonia's total installed solar capacity reached 879 MW, Lithuania attained 1.2 GW, and Latvia added nearly 500 MW.
To date, the deployment of rooftop solar across the Baltics has been driven by government incentives including subsidies and net metering, bolstered by EU funding. The researchers say the Baltics have seen a significant surge in solar energy in recent years as the region works to reduce its longstanding energy dependence on Russia.
The results show that rooftop PV systems are economically viable, with median LCOE values of 0.08 EUR/kWh for Latvia and Lithuania and 0.09 EUR/kWh for Estonia at a 6 % discount rate. Capital expenditures (CAPEX) are the most critical factor, with projected significant cost reductions by 2050 further enhancing viability.
Economic assessment of rooftop PV systems in Baltic States' multi-apartment buildings using Monte Carlo simulations. Projected LCOE for PV systems by 2050 ranges from 0.08 to 0.09 EUR/kWh at a 6 % discount rate, highlighting CAPEX sensitivity.
The researchers calculated the median LCOE at a 6% discount rate of €0.08 ($0.087)/kWh in Latvia and Lithuania and €0.09/kWh in Estonia. The LCOE across all regions ranged from €0.05/kWh to €0.12/kWh at a 6% discount rate. The researchers say these results show rooftop systems are economically viable in each of the countries.