The ELT1 resulted in a total of 739 MW of utility-scale storage being procured, with in-service dates in 2026. [4] The weighted average price for successful proponents was approximately CAD836/MW. The ELT1 also included a non-storage category for natural gas-fired power stations.
Read More Download files