▪100% lower network tariffor storage devices with an in-built capacity above 0,5 MW with aFRR accreditation, only until end of 2026 ▪Electricity producers do not pay newtork tarif –also for storage installments during feeding-in ▪The new grid connection procedure will prefer co-located storage installments (hybrid systems) ▪Map of such solar power plants in function with an in-built capacity of at least 0.5 MW which have spare grid connection capacity –possibility for co-location for batteries.